How To Screen an Awning | Installation

Fixed Awnings - Neither tracking or Velcro®

Need Assistance?

Need Help?

Give us a Call:
1-866-622-0916

Thank You For Your Order

Before you get started:
  1. Please check the contents of your kit.
  2. If there are any issues with the contents of your order including the size of your panels, Relax! We meant when we said, we will resolve any issues and we are as nice as your grandmother. We are here to please.
  3. After you've installed, if there is some issue with the stability of your panels, please call. Quite often there is an easy solution and perhaps more fastening hardware we may need to send to you. We should have an idea or two to help with unforeseen conditions. Read more about sizing errors.
  4. Don't be the "I'll-just-wing-it" type. We wouldn't have written all this information if it wasn't worth reading, so PLEASE READ and WATCH VIDEOS. It will definitely save you time, aggravation, and potentially a costly mistake. If something isn't going right, RELAX. We are always here to help if you get stuck.

Step 1: Prepare Your Magnetic Doorways (if any)

This is far easier to do when panels are in your lap instead of hanging on the track in the breeze. Setting up a doorway requires inserting magnets and fiberglass rods. Rather than try to tell you how to install, we would like to show you how with the videos below. Spacing of magnets depends upon your wind conditions and it is really up to you. For an 8-9ft tall panel, try 5 pairs. 2" from top and bottom, center, then split the differences. If wind conditions are particularly strong, consider adding another bottom magnet which is most likely to separate first and start a chain reaction.

Step 2: Hang your Panels

We have placed grommets along the top of your curtain panels that will "zip tie" to the overhead bar of your fixed awning. Intitially, keep your zip ties loose and zip tie every third or fourth grommet so that you will be able to adjust panels from side to side if necessary. If at all possible, take a path around your corner vertical supports (if you are unable for some reason, your project will require elastic cords). Reposition panels from side to side as needed, add more zip ties, and now tighten the zip ties. If you find that the sum of your panels is a bit too wide, you can generally take out width at the outer corners.

Step 3: Add Marine Snaps

Marine Snaps and Wind Direction
Marine snaps are added as needed, but positioning is important. The female snaps you place are comprised of a black or white button and a stainless steel socket. The button should face against the wind and the socket should face in the same direction as the wind is blowing towards. Let the wind reinforce the male / female snap connection, otherwise the wind will try to pry the connection loose. Some clients order the fully refundable $130 snap tool when applying many snaps while those that don't will receive an economy tool. See videos below.
Placing and Spacing
  • Make sure when placing snaps that you don't encroach on the outer most channel that holds fiberglass rod.
  • Along top - in two upper corners of panel. These are weak points that need reinforcement, especially on either side of doorways
  • Sides - About every 2-3 ft. Five up a side evenly spaced seems to work well
  • Bottom - As needed, but typically every 5 - 10 feet
  • You can always add more snaps as you watch panels perform in the wind

Step 4: Optional Hardware

If You Are Using Adhesive Snaps
Be sure to read instructions and allow them to cure 24hours before doing ANYTHING or they are worthless! Place your adhesive snaps on some cleaned surface. Don't snap to them, don't touch them, and try not to even look at them. Wait 24hrs for the adhesive to cure. Then use the snap tool to place female snaps. A little tension between snaps will force the webbing to lay flat for a good seal. If for some reason you may not have applied them correctly, try an adhesive appropriate for the attachment surface material (typically masonry). We have provided screw studs as a fail safe back up.

If You Are Screwing Into Masonry
First, you must drill a hole using a MASONRY drill bit. Your only outside purchase from any hardware store will be plastic concrete anchors that you will insert into the hole to receive the screw of the male snap. The plastic anchor is very important or the screw will chew away at the masonry making an unusable hole and will not hold.

If You Are Using Elastic Cord
Elastic cord acts as a rib that braces the curtain in the wind. Elastic cords are often place where panels turn a corner but can be placed anywhere to add significant stability to your panels. Fasten the provided D-rings above the panel and below (typically into floor). The cord is NOT fastened to the panel itself in any way. Elastic cords are particularly important if you have a panel that straddles a corner taking a path INSIDE the column. In this case the cord acts as a false column giving the panel something to go around to maintain a crisp corner.
  • We have placed a leash clip on one end.
  • Cut the cord to the desired length tight enough to be effective but not drum tight causing too much stress.
  • Place the free leash clip on the cut end and fasten to D-rings.

What To Do About Errors?

We have a very small error rate (about 1 in 200). First, we are very sorry and sometimes wish we weren't human. Even though these are hand made, it is disappointing when you receive something that isn't right. Rest assured, we will resolve it in a way you will agree is more than fair, regardless of how it happened

Coupon code = Midsummer-2018

(For your convenience we have automatically added the coupon code for you in your shopping cart)

Ok
View Later On Desktop
Would you like to send this link to yourself for later review?
This website is best viewed on desktop.
Enter your email address:
X